From attached row houses to co-op apartments and the protected blocks of Sunnyside Gardens, building here means working within tight lot lines and strict approval rules. As your general contractor we manage the full project, file the right permits, and coordinate every trade so your Sunnyside home is renovated cleanly and on schedule.
Full project management
Sunnyside is built almost entirely of attached row houses and brick co-op buildings, which changes how a general contractor runs a project. Shared party walls mean demolition, framing, and mechanical work all affect a neighbor on the other side, so the schedule has to account for noise windows, dust control, and protecting adjoining units. On a co-op renovation, the building's alteration agreement and managing agent sit on top of the city process, and your contractor coordinates insurance certificates, board approvals, and elevator or stairwell protection before a single wall comes down.
Approvals here are rarely simple. Most interior work in Sunnyside is filed with the NYC Department of Buildings, and the permit type depends on scope: a small Alt-2 for a kitchen or bath layout change, or a larger filing when you touch plumbing risers, gas lines, or load-bearing elements. If the property falls inside the Sunnyside Gardens historic district, any change visible from the street, windows, doors, roofs, fences, or facade, also needs a Certificate of Appropriateness from the Landmarks Preservation Commission before DOB will sign off. A general contractor who knows this sequence files in the right order so you are not waiting on one agency while another clock runs out.
Running the job is the other half of the work. We hold the master schedule, line up demolition, carpentry, plumbing, electrical, and finishing in the correct sequence, and keep one point of contact accountable for the whole project. That means inspections are booked when the work is actually ready, materials arrive when the trade needs them, and you are not chasing five separate subcontractors across a Sunnyside renovation.
One point of contact owns the schedule, budget, and trade sequence from demolition through final walkthrough.
We determine the right Alt-2 or larger filing, prepare documents, and manage inspections through DOB sign-off.
For Sunnyside Gardens properties we handle the Certificate of Appropriateness path with LPC before street-facing work begins.
Carpenters, plumbers, and electricians are scheduled and supervised so each phase is ready for the next.
Local knowledge
A contractor who works in Sunnyside already understands the realities of these blocks: party-wall construction, co-op alteration agreements, and the Sunnyside Gardens landmark rules that stop many renovations before they start. That experience shows up in fewer permit rejections, fewer surprise stop-work orders, and a crew that knows how to keep an attached-house job moving without damaging the home next door.
Being local also means we are responsive when a question comes up mid-project, and familiar with the DOB and LPC reviewers your filing will actually pass through.
Keep exploring
Ready when you are
Tell us about your row house or co-op renovation and we will map the permits, approvals, and trade schedule from day one.